Construction work, line transfers, humidity: when should Listeria monitoring be increased?

Published on 3 November 2026 5 min




This article is also available as a podcast in more than 20 languages. Click the ⚙️ Settings icon on YouTube, then choose Audio Track and Subtitles to watch it in your preferred language.



Construction work has just been completed in the production area. A production line is moved from one site to another. Or the factory restarts while the equipment is still wet.

These situations have one thing in common: they can change the conditions in which Listeria contamination spreads or reappears in the production environment.

According to Philippe Armaing, these are therefore specific situations where environmental monitoring deserves extra attention.

Based on his experience with biocontamination audits, he regularly sees a link between certain contamination crises and work that had previously been carried out in the facility.

Discover 7 Innovative tools to better detect

Listeria in the environment 

Why can construction work cause Listeria to reappear?

Do you sometimes see a link between work carried out in a factory and the start of a Listeria crisis?

Philippe Armaing: Yes. One thing I have noticed from experience is that quite often, when I see sites facing contamination crises, they are linked to work that has been carried out in the facility.

When work is carried out on floors, wall panels or infrastructure, established harborage sites can be disturbed and exposed again.

You need to remember that Listeria present in production areas, facilities or infrastructure can persist for several years.

Construction or renovation work can therefore create higher-risk conditions.

Established harborage sites may be disturbed and potentially lead to significant product contamination after the work.

And that is quite paradoxical, because the work is usually carried out specifically to improve the facility.


How should environmental monitoring be adapted around this type of work?

I always recommend strengthening the Environmental Monitoring Program in the affected areas during the work, and even starting slightly before it begins.

The objective is to anticipate the impact of the work as much as possible.

You should not wait until contamination appears after the modifications before starting to investigate what is happening in the environment.

Moving a production line can also move contamination

Construction work is not the only specific situation you monitor. What about transferring production lines between two sites?

That is another issue I have encountered.

In companies with several sites, production lines and equipment may need to be moved or transferred from one facility to another.

And this is not always done under the right conditions.

For example, a production line or piece of equipment may be transferred over a weekend, loaded onto a truck and then installed in another factory.

But if all the necessary precautions have not been taken, the line or equipment may not be the only thing being transferred.

Quite often, contamination from the original site can also be transferred.

This is therefore another situation to keep in mind whenever equipment is moved from one site to another.

Moisture at restart: another situation to watch closely

You also regularly mention moisture as something to watch. Why?

The objective is to restart with production areas that are as dry as possible after cleaning, especially when cleaning takes place overnight.

During my investigations, I attend morning restarts, and this is still quite a common issue.

The wetter the environment is at restart, the more favourable the conditions can be for product contamination.

If production areas and equipment have not been dried sufficiently, moisture can potentially release contamination present within equipment or conveyor bearings.

This is something that absolutely needs to be addressed.


And is that why the first product manufactured after cleaning is not necessarily the safest?

Yes. Quite often, manufacturers assume that the first product made in the morning is the safest.

But potentially, it can actually be the most critical because there may still be moisture and contamination being released.

So you need to pay particular attention to the conditions in which equipment and production areas are restarted.

Why Listeria can also be found in new or renovated factories

You also say that new or renovated factories are not necessarily protected from these problems. Why?

This is something that can be quite difficult to explain to manufacturers.

When a factory is renovated, with newer and better-maintained infrastructure, you can paradoxically sometimes see more problems than before.

In older facilities, there was more microbial competition because an established flora was already present in the production areas, equipment and infrastructure.

When the factory is renovated, there may be less microbial competition. This can potentially make it easier for Listeria to become established.

So in some situations, the newer the factory, the more significant the Listeria risk may become.

But once this is understood, if flows are properly managed and the production environment is correctly monitored, there is no reason why the risk cannot be effectively controlled.



Many thanks to Philippe Armaing for sharing his experience on these specific situations that can affect the risk of Listeria contamination.

If you have a question, feel free to ask. We will do our best to answer it.